Log time on a task

Planix tracks time at the task level. Each task carries an optional estimate (how long it should take). Actual time is logged as one or more time entries — typed in by hand at the end of a session, or whenever you remember. The Timesheet view rolls up all your time entries by date so you can see where the week went.

Goal

By the end you will have set an estimate on a task, logged at least one time entry against it, watched the progress indicator update, and looked at your week in the Timesheet view.

Prerequisites

  • A task in Planix you have access to — yours, or one you can edit (see Add and manage tasks).
  • Planix open and the OpenRegister back end connected.

Steps

  1. Open the task detail. Find the Estimate field on the Time tracking panel. Type an estimate — Planix accepts 2h 30m, 150m, 1.5h, 90 (interpreted as minutes), 2h. It stores the value as an integer minute count and renders it back in human form (1h 30m).

    Setting an estimate on a task

  2. The estimate also shows on the kanban card (small clock icon + duration) so the team has a visual hint of how long a card is meant to take. Cards that look short stay short; cards that look long get split.

    Task card showing the estimate

  3. Log time. Click Log time on the task detail. The log dialog opens — duration (same parser as the estimate), date (defaults to today), description (optional but useful: "Pair session with @Bob", "Drafted the migration script"). Save.

    Log time dialog

  4. The time entry appears on the task. The Time tracking panel now shows logged / estimate — e.g. 1h 30m / 3h. Log more time as you go — multiple entries per task per day are fine. Once logged exceeds estimate, the progress indicator turns red as a soft warning that the task is over-running.

    Time entries on a task — over-run case

  5. Open Timesheet from the Planix navigation. Your time entries roll up by date — newest first — with daily totals, weekly totals, and a date-range filter (This week, Last week, or a custom range). Each row links back to the task; the back button on the task returns to the timesheet at the same scroll position and same filter.

    Timesheet view, weekly roll-up

Verification

The task's estimate is set and shows on the card. The time entries you logged sum to the value shown on the task's Time tracking panel. The Timesheet view lists your entries grouped by date with correct daily and weekly totals. Editing or deleting a time entry is allowed only on your own entries — the same edit/delete on someone else's entry returns 403.

Common issues

SymptomFix
"Invalid duration" on the estimate fieldThe parser accepts 2h 30m, 150m, 1.5h, 90, 2h — anything else (zero, negative, words) is rejected. Use one of those forms.
Time entries sum doesn't match the panelBrowser cache; reload the task. The panel reads through the entries store with no debounce, but a stale tab can drift.
Can't edit someone else's time entryBy design — only the entry's author can edit or delete it. Ask them, or have an admin do it via the OpenRegister object directly.
Timesheet shows no entries on a day you workedThe custom range filter is too narrow — switch to This week or Last week and recheck.
Estimate shows as on a cardNo estimate set on the task; click the card to open it and set one.
Screenshots may be missingApp not yet installed in the test environment; rerun npm run test:e2e:docs once it is.